Agendas & Minutes

Planning Commission 11/5/2008 Regular Meeting

Links to the official agenda(s), board letters and supporting documents are found here. If an item number is blue there is a board letter is available for it, so click the item number to view the board letter. If an item has any supporting documents, they will be displayed by the item number. The document's title is a link to the actual document. The attachment type and file size are listed next to the title. Please see the agenda link(s) below for the official PDF agenda(s).

View the Agenda

8A

BOB KLEIS / JAMES E. VASSER JR. / VASSER WINERY - USE PERMIT #P07-00598-UP
CEQA Status:
Mitigated Negative Declaration Prepared. According to the proposed mitigated negative declaration, if mitigation measures are not included, the proposed project would have potentially significant environmental impacts in the following areas: Aesthetics and Biological Resources. The project site is not on any of the lists of hazardous waste sites enumerated under Government Code section 65962.5
Request: Approval of a Use Permit to establish a new 36,000 gallon per year winery with: 1) a 7,000 sq. ft. winery cave including production, storage, office, and tasting room facilities; 2) a 5,500 sq. ft. uncovered outdoor crush pad and loading area; 3) a winery/agricultural storage barn totaling 1,800 sq. ft. and including 900 sq. ft. of winery equipment storage; 4) two full-time and two part-time employees; 5) eleven parking spaces; 6) by-appointment tours and tastings with a maximum of 16 visitors per day and 36 per week; 7) a marketing plan with four 50-person max. marketing events and one 100-person max. wine auction event annually; 8) an exception to the Road and Street Standards to allow a new winery access road with widths between 14 and 18 ft. (18 ft. required); and 9) the construction of four turnouts on Chimney Rock Road. The project is located on a 42.4 acre parcel located on the west side of Soda Canyon Road, adjacent to its intersection with Chimney Rock Road, and within the AW (Agricultural Watershed) zoning district. APN: 039-630-011. 2001 Soda Canyon Road, Napa, CA  94559.

Staff Recommendation:  Continue the item to the November 19, 2008 regular Planning Commission hearing 

Staff Contact: Chris Cahill, 253.4847 or ccahill@co.napa.ca.us


9A

ALPHA OMEGA WINERY, LLC. / ALPHA OMEGA WINERY – VARIANCE AND USE PERMIT MAJOR MODIFICATION REQUEST #P08-00047 AND #P07-00869-MOD
CEQA Status:
  Subsequent Mitigated Negative Declaration Prepared. According to the proposed Subsequent Mitigated Negative Declaration, the proposed project would have, if mitigation measures are not included, a potentially significant environmental impact in the following area: transportation/traffic. This project site is not on any of the lists of hazardous waste sites enumerated under Government code section 65962.5
Request: Approval of a Variance: to allow a new production/barrel building to encroach a max.of 74 ft. into the required 300 foot setback from centerline of Mee Lane and a corner of the new covered porch addition on the existing winery building to encroach 127 ft. into the required 600 foot setback from centerline of St. Hwy. 29 and a Use Permit Modification: to modify Use Permits: #U-118081, #U-538485, & #95037-MOD in 2 phases: Phase A: (1) establish the size of the pre-Winery Definition Ordinance public tasting room; (2)(a) Public Tours and Tasting Visitors: recognize Public Tours and Tasting visitors without prior appoint. at a max. of 900 visitors/wk; (2)(b) By Appointment Tours and Tasting Visitors: establish Tours and Tasting by Appoint. Only Visitors and combine them with Marketing event visitors for max.of 450 visitors/wk. The total combined Public, By Appt.& Marketing visitors not to exceed a max.of 1,350 visits/wk; (3) increase employees to 19 f/t and 6 p/t with an additional 15 p/t, seasonal workers during Harvest; (4) establish a Marketing Plan to include: 7 events/mo. with a max.of 50 people/event, 10 annual events with a max.of 100 people/event, and 6 annual events with a max. 200 people/per event (2 for the Napa Valley Wine Auction).  Events to be catered by off-site food service; (5) authorize the use of the covered patio and garden areas by visitors; (6) add a 2nd work shift during Harvest only; (7) increase parking to 63 auto & 2 bus spaces; and, (8) convert the existing wastewater pond to a dual domestic and process wastewater system. Phase B: (1) construct a new approx. 9,273 sq. ft. production/barrel building adjacent to the existing 6,298 sq.ft.winery structure totaling approx.15,571 sq.ft.; (2) increase production from 50,000 gal.to 144,000 gal. The project is located on a 10.79 ac. parcel on the southeast side of Mee Lane approx.760 ft. northeast of its intersection with St. Highway 29 & approx.2 mi. south of the City of St. Helena.(Assessor’s Parcel #: 030-080-046) 1155 Mee Lane, St. Helena.

Supporting Documents
A Exhibit A - Findings Required for Approval of a Variance and Use Permit ( Adobe PDF Document - 191 kb )
B Exhibit B - Proposed Conditions of Approval ( Adobe PDF Document - 482 kb )
C Exhibit C - Project Revision Statement (July 29, 2008) ( Adobe PDF Document - 41 kb )
D Exhibit D - Mitigation Monitoring and Reporting Program ( Microsoft Word Document - 43 kb )
E WDO Discussion - Past Aerial Photos & Winery Spreadsheets ( Adobe PDF Document - 2930 kb )
F Environmental Management Conditions Memo ( Adobe PDF Document - 96 kb )
G Fire Marshall's Conditions Memo ( Adobe PDF Document - 138 kb )
H Public Works Conditions Memo ( Adobe PDF Document - 153 kb )
I Public Works Transportation Division Comments Memo ( Adobe PDF Document - 33 kb )
J Caltrans Comment 1 Deceleration Lane w Consultant Response ( Adobe PDF Document - 108 kb )
K Caltrans Comment 2 Saturday Que w Consult & Pub Wks Response ( Adobe PDF Document - 122 kb )
L Caltrans Comment 3 Saturday Shuttle Bus Mitigation w Consult Response ( Adobe PDF Document - 61 kb )
M Building Division Conditions Memo ( Adobe PDF Document - 78 kb )
N Calif Highway Patrol & Sheriff's Comments ( Adobe PDF Document - 48 kb )
O Delta Engineering Letter Re: Wastewater Expansion ( Adobe PDF Document - 65 kb )
P Previous Staff Report and Cond of Apprvl U-118081 ( Adobe PDF Document - 662 kb )
Q Previous Staff Report and Cond of Apprvl U-538485 ( Adobe PDF Document - 695 kb )
R Previous Staff Report and Cond of Apprvl 95037-MOD ( Adobe PDF Document - 114 kb )
S Previous Staff Report and Cond of Apprvl P07-00330-MODMIN ( Adobe PDF Document - 181 kb )
T Subsequent Mitigated Negative Declaration / Inistial Study ( Adobe PDF Document - 1504 kb )
U Favorable Neighbor Comments ( Adobe PDF Document - 442 kb )
V Concerned Neighbor Comments ( Adobe PDF Document - 1253 kb )
W Application Materials with 75% Grape Source Agreement ( Adobe PDF Document - 6370 kb )
X Final Project Graphics ( Adobe PDF Document - 2345 kb )