Links to the official agenda(s), board letters and supporting documents are found here. If an item number is blue then a board letter is available for it, so click the item number to view the board letter. If an item has any supporting documents, they will be displayed by the item number. The document's title is a link to the actual document. The attachment type and file size are listed next to the title. Please see the agenda link(s) below for the official PDF agenda(s).


View the Agenda

7A

EAGLE VINES WIRELESS TELECOMMUNICATIONS AT&T/SPRINT PROJECTS / NAPA SANITATION DISTRICT / USE PERMITS 18-00410-UP & 19-00337-UP

CEQA Status: Consideration and possible adoption of a Mitigated Negative Declaration. According to the Mitigated Negative Declaration, the proposed project would have potentially significant effects on Biological Resources, Cultural Resources, Geology and Soils, and Tribal Cultural Resources, unless mitigation measures are adopted. This project site is not on any of the lists of hazardous waste sites enumerated under Government Code Section 65962.5.

Request: The project consists of a request to construct co-located wireless telecommunications facilities for AT&T and Sprint on a portion of the Eagle Vines Golf Club (EVGC) site. The proposed AT&T facility would include: (1) construction of a 50-foot tall steel monopine tower with ‘faux pine’ foliage; (2) installation of 12 panel antennas; (3) installation of 15 Radio Remote Heads (RRHs); (4) a 20-foot by 15-foot lease area and fenced equipment enclosure including ground mounted equipment cabinet(s), a 24-hour emergency power backup generator, and other equipment necessary for the daily operation of the facility; and (5) extension of underground power to the facility from an existing on-site pull box. The proposed Sprint facility would include: (1) construction of a 55-foot tall steel monopine tower with ‘faux pine’ foliage; (2) installation of six (6) panel antennas; (3) installation of 12 Radio Remote Heads (RRHs); (4) a 20-foot by 15-foot lease area and fenced equipment enclosure including ground mounted equipment cabinet(s), a 24-hour emergency power backup generator, and other equipment necessary for the daily operation of the facility; and (5) extension of underground power to the facility from an existing on-site pull box. Although both carriers will utilize different lease areas for the telecommunications equipment and monopine antenna towers, the proposed project is considered co-located based on the general clustering of the proposed infrastructure. The monopine towers will be located approximately 160 feet apart along the northwest corner of the outside fence of the existing golf course driving range and the two equipment enclosures areas are approximately 55 feet apart. Access to the site is from an existing maintenance road off the main parking area of the Eagle Vine Golf Club. The project is located at 580 South Kelly Road, approximately ¼ mile south of its intersection with Highway 12, within the Agriculture Watershed: Airport Compatibility (AW:AC) zoning district and a General Plan designation of Industrial. APN: 057-060-007; American Canyon.

Staff Recommendation: Adopt the Mitigated Negative Declaration and approve the Use Permits with the proposed conditions of approval.

Staff Contact: Sean Kennings, Contract Planner, (415) 533-2111, or sean@lakassociates.com; or John McDowell, Supervising Planner, (707) 299-1354, or john.mcdowell@countyofnapa.org

Applicant Contact: ATT Mobility; contact - Derek Turner, (415) 420-4922, or dturner@J5ip.com- Sprint; contact – Sean Prior (Precision SD), (916) 918-9322, or sean@precisionSD.com

Supporting Documents
A Recommended Findings - AT&T Facility ( Adobe PDF - 56 kb )
B Recommended Conditions of Approval - AT&T Facility ( Adobe PDF - 120 kb )
C Recommended Findings - Sprint Facility ( Adobe PDF - 56 kb )
D Recommended Conditions of Approval - Sprint Facility ( Adobe PDF - 120 kb )
E Initial Study/Mitigated Negative Declaration ( Adobe PDF - 277 kb )
F Use Permit Application Packet - AT&T Facility ( Adobe PDF - 3226 kb )
G Use Permit Application Packet - Sprint Facility ( Adobe PDF - 2142 kb )
H Biological Evaluation ( Adobe PDF - 4122 kb )
I Photo Simulations - AT&T Facility ( Adobe PDF - 5085 kb )
J Photo Simulations - Sprint Facility ( Adobe PDF - 4819 kb )
K Alternative Sites/Coverage Area - AT&T Facility ( Adobe PDF - 447 kb )
L Alternative Sites/Coverage Area - Sprint Facility ( Adobe PDF - 4732 kb )
M Graphics - AT&T Facility ( Adobe PDF - 18261 kb )
N Graphics - Sprint Facility ( Adobe PDF - 13607 kb )

7B

GREENWOOD MANSION CAFÉ / VINUM CELLARS – SPECIFIC PLAN AMENDMENT P17-00019-SPA & USE PERMIT P17-00099-UP

CEQA Status: Consideration and possible adoption of a Negative Declaration. According to the proposed Negative Declaration, the proposed project would not have any potentially significant environmental impacts. The project site is not included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5.

Request: Approval of a Specific Plan Amendment and Use Permit to replace the terms of Use Permit U-89-55, U-90-11 and #98272-MOD with respect to the subject property and converting an existing 3,090 sq. ft. office building within a 1880’s farmhouse to a café, winery with wine tasting, and office including: Convert 840 sq. ft. of the main building lower floor to a café including commercial kitchen and indoor food service seating area; convert remaining 920 sq. ft. of the main building lower floor to wine tasting room with tasting bar and indoor seating area; retain and upgrade existing 1,330 sq. ft. main building second story for office use including establishment of conference room and installation of 90 sq. ft. elevator shaft and small lobby area; construct new ancillary 680 sq. ft. carriage house on the north side of the main building for wine production; construct approximately 1,200 sq. ft. uncovered, unenclosed deck for use as outdoor café and wine tasting seating; reconfigure and add parking spaces for a total of 32 on-site parking spaces (within a 231 space shared access parking lot serving APN’s 057-200-028, -029, -030, -031, -032, and -033); annual maximum production of 1,200 gallons of wine; replacement of approximately 15,000 sq. ft. of existing lawn area with vineyard; a maximum of 10 full-time employees, and 5 part-time employees; total café and wine tasting seating not to exceed 60 seats (inclusive of all indoor and outdoor seating). The project is located on an approximately 1.17 acre site within the IP:AC (Industrial Park: Airport Compatibility) zoning district and a General Plan designation of Industrial at the northwest corner of Airport Boulevard and Devlin Road, 499 Devlin Road, Napa (Assessor's Parcel Number 057-200-028).

Staff Recommendation: That the Planning Commission conduct a public hearing and forward a recommendation to the Board of Supervisors to approve the project.

Staff Contact: John McDowell, (707) 299-1354, john.mcdowell@countyofnapa.org

Applicant: Richard Bruno, Vinum Cellars, (415) 260-6648, richard@vinumcellars.com

Applicant Representative: Diane G. Kindermann, Abbott & Kindermann, Inc. Attorneys at Law, (916) 456-9595


7C

CHAPPELLET WINERY, INC / CHAPPELLET WINERY / USE PERMIT MAJOR MODIFICATION # P18-00307 AND EXCEPTION TO THE NAPA COUNTY ROAD AND STREET STANDARDS

CEQA Status:
Consideration and possible adoption of a Mitigated Negative Declaration. According to the proposed Mitigated Negative Declaration, the proposed project would not have any potentially significant environmental impacts after implementation of mitigation measures. Mitigation measures are proposed for the following areas: Biological Resources, Geology and Soils, and Transportation. This project is not on any lists of hazardous waste sites enumerated under Government Code Section 65962.5.

Request: Approval of a Use Permit Major Modification to an existing 150,000 gallon per year winery to allow the following: (1) Increase in maximum annual permitted wine production from 150,000 to 250,000 gallons; (2) Increase daily tours and tastings from 40 persons per day (no appointment required), 280 person per week maximum to 95 persons per day (appointment required for the additional 55 persons per day), 665 visitors maximum per week; (3) Modification of an existing Marketing Program to increase events from 54 events per year (2,470 guests) to 76 events per year (4,230 guests) as follows: (a) Ten (10) annual events for up to 20 guests; (b) Six (6) annual events for up to 80 guests; (c) Three (3) annual events for up to 160 guests; (d) Three (3) annual events for up to 200 guests; and (e) Use of shuttle service from an off-site pick up area for all events of greater than 100 persons; (4) Increase parking spaces from 26 spaces to 38 spaces and provide a minimum of two on-site bicycle parking spaces; (5) Increase the number of employees from 24 to 30; (6) Upgrade the existing water system permit from a Transient Non Community (TNC) water system to a Non-Transient Non-Community (NTNC) water system; and (7) Improvement of the existing access driveway and Pritchard Hill Road to County standards except for the request noted below.

The project also includes a request for an exception to the Napa County Road and Street Standards (RSS). The request proposes an exception to the Napa County RSS to allow for a reduction of driveway width for some portions of the existing driveway, and for a portion of road with slopes exceeding 18 percent but less than 20 percent without transition zones (sections of road not exceeding 10 percent for 100 feet in length immediately preceding and ensuing the section of road with the roadway grade of 18 to 20 percent). An exception was requested by the applicant and tentatively approved by the Public Works Department to allow the Chappellet Winery Use Permit Modification to be approved without the requirement that a left turn lane be installed at the intersection of the property driveway and Sage Canyon Road. The project is located on a 15.01 acre site within the AW (Agricultural Watershed) zoning district and has an AWOS (Agriculture, Watershed, and Open Space) General Plan land use designation at 1579 and 1581 Sage Canyon Road, St. Helena, CA; APN: 032-010-090; and 098, respectively.

Staff Recommendation: Adopt the Mitigated Negative Declaration and approve the Exception to the Napa County Roads & Street Standards and Use Permit Major Modification, as conditioned.

Staff Contact: Jason R. Hade, Principal Planner (707) 259-8757 or Jason.hade@countyofnapa.org

Applicant: Dave Pirio, Director of Vineyard Operations; (707) 286-7137 or dave@chappellet.com

Applicant Representative: Jeffrey Redding, AICP, Land Use Planning Services, 2423 Renfrew Street, Napa, CA 94558, (707) 255-7375 or jreddingacip@comcast.net

Supporting Documents
A Recommended Findings ( Adobe PDF - 70 kb )
B Recommended Conditions of Approval and Final Agency Approval Memos ( Adobe PDF - 11740 kb )
C Previous Conditions ( Adobe PDF - 1656 kb )
D Initial Study/Mitigated Negative Declaration ( Adobe PDF - 641 kb )
E Use Permit Major Modification Application Packet ( Adobe PDF - 4944 kb )
F Road and Street Standards Exception Request ( Adobe PDF - 9424 kb )
G Left Turn Lane Exception Request and Public Works Department Determination ( Adobe PDF - 5479 kb )
H Water Availability Analysis ( Adobe PDF - 2875 kb )
I Wastewater Feasibility Study ( Adobe PDF - 214 kb )
J Biological Resources Survey ( Adobe PDF - 4563 kb )
K Traffic Impact Study ( Adobe PDF - 33233 kb )
L Graphics ( Adobe PDF - 24648 kb )
M Winery Comparison Analysis ( Adobe PDF - 169 kb )
N Public Comments ( Adobe PDF - 2969 kb )
O Additional Public Comments (Added after initial agenda posting) ( Adobe PDF - 277 kb )